California Greenhills Estates Backbone and In-track Construction
The project was a 457-acre new development in the Central Valley.
FCS staff Experience: Provided construction management for the $7.7M new construction project. Duties included administering the bidding, negotiation, and awarding of contracts with the General Contractors. Oversaw all aspects of design and construction including demolition, new wet and dry underground utilities, new overhead utility construction, and surface improvements including sidewalk, curb, gutter, and paving. Managed change order proposals and negotiation, schedule updates, claim resolution and progress payment verification.
Monterey County and Granite Construction
Gonzales, CA
Old Stage Road and Alta Street Improvements
FCS Staff Experience: Acted as the Resident Engineer and Inspector for Granite Construction’s permit project for their new Handley Quarry. As the County’s representative onsite, FCS Staff were responsible for the engineering integrity of the construction project. FCS oversaw all aspects of road construction, mass excavation, SWPPP implementation, grading, paving operations, and striping/signage operation. Transmitted and tracked RFIs, submittals, quantity logs, safety reports, SWPPP review, and overall QC/QA reports. While performing the service, all paperwork met the County and Caltrans regulations and a complete report was provided at the conclusion of the project.
Caltrans District 4 and Norcal Waste Systems
Gilroy, CA
Hwy 152/Bloomfield Improvement Project
FCS Staff Experience: Acted as owner’s representative, construction management and resident engineer for the $550K Caltrans permit project for Norcal Waste Systems. The services included the preparation and management of the bid process for the project. As the CM/RE all pre-construction submittals were processed so that the project was built per the approved plans and specifications. FCS oversaw all aspects of road construction, mass excavation, SWPPP implementation, grading, paving operations, and striping/signage operation. Transmitted and tracked RFIs, submittals, quantity logs, safety reports, SWPPP review, and overall QC/QA reports. While performing the service all paperwork met Caltrans regulations and a complete Caltrans Report was provided at the conclusion of the project.
El Rancho San Benito
Hollister, California
IMP Implementation Plan
FCS acted as the construction manager for the implementation plan for the existing active sand quarry in San Benito County.
Mr. Felice’s work included contract negotiation, change order negotiation and the day-to-day management of the project.
Recology Environmental
Gilroy, CA
Stream Realignment / Site Expansion Project
The project consists of the realignment of an existing river channel for the expansion of the Recology Landfill in Gilroy to expand its processing area.
The project involved local, state and federal agencies and was completed on time and under the initial budget.
Recology Environmental
Gilroy, CA
Hillside Slide Remediation Project
The project consisted of the repair work associated with a hillside slide at the Recology Pacheco Pass landfill. The scope of work included on-site inspection and management for the owner.
The project involved local, state and federal agencies and was completed on time and under the initial budget.
Carmel Unified School District
Carmel, California
Green Classroom Estimating, Value Engineering and Constructibility Services
Carmel Unified School District requested the services of FCS to perform a complete estimate for a new Green Classroom.
FCS services included a complete estimate, a complete constructibility review as well as an extensive value engineering exercise to get the project to within the project budget.
FCS worked very closely with the District’s administration to prepare these documents.
Carmel Unified School District
Carmel, California
Carmel High School Administration Building, Estimate and Constructibility Review
Carmel Unified School District requested the services of FCS to perform and complete estimates for the renovation of the existing Administration Building which was constructed in 1939.
FCS services included a complete estimate and constructibility review.
FCS worked very closely with the Districts administration to prepare these documents.
Carmel Unified School District
Carmel, California
Carmel High School Football Field, Estimate and Constructibility Review
Carmel Unified School District requested the services of FCS to perform and complete estimates for the renovation of the existing Football field, which included the resurfacing of the track, a new score-booth, new scoreboard, track and the replacement of the existing sod with synthetic turf.
FCS services included a complete estimate and constructibility review.
FCS worked very closely with the Districts administration to prepare these documents.
Santa Clara Valley Water District
San Jose, California
Santa Clara Valley Water District San Jose Campus Master Estimate
Santa Clara Valley Water District requested the services of FCS to perform and complete estimates for their entire San Jose Campus. The work included estimates for the administration building, maintenance shops, laboratories and the corporate office.
FCS services included a complete estimate and constructibility review.
Mr. Felice worked very close with the water districts facilities director to prepare these documents for their future $10M renovations project.
King City Cemetery District
King City, California
New Access Road and Chip-seal Project
FCS provided construction management for the $250K project. Duties included administering the bidding, negotiation, and awarding of contracts with the General Contractors. Oversaw all aspects of construction including demolition, sub-grade, grading and paving. FCS also managed change order proposals and negotiation, schedule updates, claim resolution and progress payment verification.
Food and Drug Administration (FDA)
Salinas, California
FDA Mobile Lab Site - Salinas, CA
The FDA was looking for a permanent home for their mobile lab which deploys to Salinas several times a year. They needed a 1-acres secured, paved site with lighting.
FCS was the construction manager for this project and managed the the inspectors, engineer and the general contractor on a daily basis.
San Benito High School
Hollister, California
High School Master Planning, Estimating and Construction Administration Services
San Benito High School is in the process of evaluating the need to renovate their existing campus and purchase land for a new high school.
FCS is working with the architect and the district on programming, community outreach and estimating services for the District.
University of Santa Cruz
Salinas, California
MircoGrid & Wind Turbine
UCSC was approved for a grant which would build a MicroGrid and Wind Turbine for instructional purposes.
FCS is the project manager working with the biological consultant, soils engineer, engineers and contractors.